Cladding layer
State the required corrosion-resistant material by grade and governing specification. Nickel-alloy requests may include Alloy 625, Alloy 825, C-276 or Monel 400 when specified by the design or customer document.
Project material sourcing
For corrosion-resistant process equipment and pressure-component projects, explosion bonded clad plate combines a specified cladding material with a structural base plate. Laixi reviews the drawing, material combination, inspection and delivery requirements and coordinates the appropriate supply route.
Representative partner-facility image. Final production route and inspection scope are confirmed per order.What the RFQ must define
Explosion bonding is a project-specific joining route. The material combination, thickness ratio, dimensions and acceptance criteria must be agreed before a quotation can be compared.
State the required corrosion-resistant material by grade and governing specification. Nickel-alloy requests may include Alloy 625, Alloy 825, C-276 or Monel 400 when specified by the design or customer document.
Identify the structural base material, plate grade, thickness and any pressure-vessel or fabrication-code requirement. Do not assume the base plate from the cladding grade alone.
Specify single-side or double-side cladding, cladding-side location, nominal layer thickness and any unbonded edge, weld-preparation or machining allowance.
Provide plate width, length, total thickness, tolerances, flatness requirements and whether the plate will be formed, machined or welded after delivery.
Inspection planning
Inspection requirements affect material routing, lead time, packing and quotation scope.
State the requested examination method, coverage, acceptance criteria and reporting format from the governing specification or approved inspection plan.
List the requested material test certificate level and the cladding/base-plate traceability required for the project documentation package.
If an agency, hold point or witness point is required, include it in the first RFQ together with the inspection location and acceptance procedure.
Attach the drawing, data sheet and any forming, cutting, edge-preparation, overlay-welding or corrosion-allowance requirement that could affect supply condition.
Copy-and-send RFQ
Send the project data sheet or drawing when available. Each plate configuration should be listed separately.
Cladding material / standard / thickness: ___
Base material / standard / thickness: ___
Bond configuration: Single side / double side / other ___
Plate dimensions and tolerances: ___
Drawing / equipment service: ___
Inspection, certificate and third-party requirements: ___
Quantity, destination, Incoterm and required date: ___
Project inquiry
We will review the material route, dimensions, documentation, inspection and export-packing requirements before quotation.